How to read a home interior quotation, line by line

Most interior quotes are designed to be compared on the last page. Here is how to compare them on every page — area maths, unit counts, hardware brands and exclusions.

A designer walks you through a beautiful 3D render and hands over a PDF ending in one big number. That number is the least informative part of the document. The decisions that determine what you actually pay — and what you actually receive — are buried in unit rates, area definitions and a short exclusions paragraph near the end.

Step 1 — Normalise the scope before comparing rupees

Brand A quotes 11 units, Brand B quotes 9 units for 'the same' home. Until you list every unit side by side, you are not comparing prices — you are comparing different houses.

  • Write out every room, and under it every unit: wardrobe, loft, kitchen base, wall units, tall unit, TV panel, study, crockery, dresser, pooja unit, bed, side tables.
  • Mark units present in one quote and missing in the other. Missing lofts and crockery units alone account for ₹80,000–₹1.5 lakh in most 3 BHK gaps.
  • Note quantities and sizes — a 7ft wardrobe against an 8ft wardrobe is a 14% material difference at the same 'rate'.

Step 2 — Understand which area is being billed

BasisWhat it meansEffect on your bill
Shutter / front areaHeight × width of the visible front onlyLowest apparent rate; loft and internals often charged extra
Carcass / developed areaTotal board surface used, including internals and shelvesHigher apparent rate but usually a more complete number
Running footLength × a standard height assumptionFine for kitchens; hides height differences (7ft vs 9ft) completely
Lump sum per unitOne price for the whole itemEasy to read, impossible to verify — always ask for the area split

Audited insight

The most common comparison error

Comparing a shutter-area rate of ₹1,450/sq.ft against a developed-area rate of ₹1,150/sq.ft and concluding the second is cheaper. Convert both to the same basis first — the ranking often flips.

Step 3 — Audit the hardware line

Hardware is typically 8–14% of woodwork value, and it is where mid-project substitution happens most often. 'Soft-close hinges' with no brand can mean a ₹90 hinge or a ₹380 hinge — across 120 hinges that is a ₹35,000 swing you never see.

  • Insist on the brand and series for hinges, channels, tandem boxes, baskets and handles.
  • Ask for the warranty term in writing, and whether it is the manufacturer's or the vendor's.
  • Check the count: number of drawers, baskets and lift-ups is a quantity, not an adjective.

Step 4 — Read the exclusions paragraph first, not last

  • Civil work, plumbing shifts, and electrical points — often excluded and later billed at ₹700–₹1,500 per point.
  • Countertop, sink, hob, chimney and appliances — regularly outside the 'modular kitchen' line.
  • False ceiling, painting and wallpaper — priced separately in most 'full home' packages.
  • Loose furniture, curtains, lighting fixtures and décor — almost always excluded.
  • Transport, site handling, loading charges and design fees — small individually, ₹40,000+ together.
  • GST — 18% on most interior work. A quote 'excluding taxes' is not a comparable number.

Step 5 — Check payment terms and the change-order clause

ClauseReasonableRed flag
Booking advance10%25%+ before design freeze
Milestone scheduleDesign freeze / production / delivery / handoverOne large payment before production
Change ordersWritten approval with per-item rate'Rates as applicable at time of change'
Delay penaltyDefined per-week compensationNo mention of timelines at all
Warranty1 year service + 5–10 years on materials'As per company policy' with no document
You are not negotiating a discount. You are negotiating a specification. Discounts on a vague scope are just cheaper vagueness.